bucky
New member
Thought i would post up what plans are in the offing.
I have owned the BEAST for just over 3 months now and already have big plans for it.
Work done:
Scorpion Cat back exhaust system.
Full Service
Tyres 4 new Michelin 195/55R15
Work planned:
Rust treatment and respray of both rear arches, Merlin Coachworks in Fram.
Pipercross induction kit.
Decat + Stainless Manifold ( Flex pipe is on its way out )
Suspension lowered by 40mm
Hopefully a Leather interior from a Millie or Thunder to set the interior off a freat.
A Shiny new Zetec S leather steering wheeel in red.
There are plans for a Remap but i will wait and see how much the bank(Wife) will let me play with.
And once all that goes ahead The beast should be ready to Play Nice
I have owned the BEAST for just over 3 months now and already have big plans for it.
Work done:
Scorpion Cat back exhaust system.
Full Service
Tyres 4 new Michelin 195/55R15
Work planned:
Rust treatment and respray of both rear arches, Merlin Coachworks in Fram.
Pipercross induction kit.
Decat + Stainless Manifold ( Flex pipe is on its way out )
Suspension lowered by 40mm
Hopefully a Leather interior from a Millie or Thunder to set the interior off a freat.
A Shiny new Zetec S leather steering wheeel in red.
There are plans for a Remap but i will wait and see how much the bank(Wife) will let me play with.
And once all that goes ahead The beast should be ready to Play Nice